Generating Excitement for our Project!
Generating Excitement for our Project!
As work proceeds apace on our exciting Renewal of Space, this past week saw the arrival of the back-up generator. As those of you who live in close proximity to the Temple can attest, the reliability of the local electrical grid is less than ideal and, especially during inclement weather, power outages are regular occurrences. As a result, and to protect our guests and staff, a generator of sufficient capacity to ensure constant operation of the life-safety systems in the building, was included in the specifications requested by the Building Committee.
This important piece of equipment arrived with much fanfare, necessitating a closure of Dewbourne Avenue. A massive crane – we were told it had a 150 ton capacity – blocked the road and then, once the receiving crew was in place on top of the new mechanical room, it easily hoisted the generator into place. Enjoy the photos below and click here to watch the videos of this exciting process!
Aleinu … It is upon US.
Perhaps an even more exciting development also occurred this past week, as Phase 1 fundraising surpassed the $27.5 million mark. To start a conversation about joining your fellow congregants in making a pledge to the Renewal Project and helping us to achieve our goal of fully funding Phase 1 in time for our planned opening before the upcoming High Holy Days, please contact Jonathan Ain, Director of Development, at 416-789-3291, extension 249 or email jain@holyblossom.org.
As always, we thank you for your continued readership, viewership and support (financial and otherwise) of our Renewal Project.
Leave a Reply
Want to join the discussion?Feel free to contribute!